accurate proposals begin with accurate rfq's
remove all assumptions
Use this list as the basis for an RFQ checklist for future projects.
n this white paper, we'll discuss more specific tips OEMs can put into practice to ensure all competing quotes they receive will be accurate and comparable and remember to remove all assumptions by documenting everything.
Critical information includes:
- 3D CAD files and 2D drawings
- Part Material
- Production Volumes
- When will the tooling and first production parts be needed?
- Secondary Operations
- Type of Packaging
- Validation Requirements
- Bidding Domestic, Offshore or both?
For more information please read the complete article!
Download Now!
Blogs
Our blogs are a great way to keep up with the latest industry, news, trends and information.
View All Blogs
-
Sep 29, 2026
When do medical components need ISO 7 cleanroom injection molding?
Read MoreIn medical device manufacturing, the required production environment should follow the component's...
-
Aug 27, 2026
Questions To Ask Before Finalizing A Resin For Your Injection Molded Component
Read MoreWhat Performance Requirements Must Your Component Meet?
Before evaluating specific resins, define...
-
Aug 06, 2026
ABS vs Polypropylene (PP): How to Select the Best Plastic for Your Projects
Read MoreUse ABS for rigid, durable parts requiring a high-gloss finish and dimensional stability. Choose...